Carbon Capture Costs: FEED & pre-FEED Cost Reports
Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.
Comparing 3 reports — tab selection applies to every column.
Milton R. Young Power Plant
CO₂ captured
4,297,145t/yr
Capture efficiency
90.0%
Utilization
85.0%
Parasitic load
83.3MW
CO₂ concentration
8.6%vol%
▸Direct Field Costs$1.34B
Balance of Plant (Boiler, cooling tower, multipurpose building and substation)—
Earthwork Associated with Carbon Capture—
Water Supply and Treatment—
Wastewater—
Drainage—
Power Supply—
Controls & Internet—
Owner Facilities—
Impurity Removal and CO2 conditioning—
Enclosures & Buildings—
Carbon Capture Plant—
▸Indirect Field Costs$61.5M
Project Management—
Limited Notice to Proceed—
Services—
Miscellaneous Project Expenses (Insurance, taxes, bonds & permits)—
▸Contingency & Escalation$470.0M
Owner's Cost Contingency—
EPC Contingency—
Escalation—
Regional Adjustment for Labor—
▸Interest During Construction—
Report did not provide a further cost breakdown.
▸Owners Cost$71.2M
Spare Parts—
License fee—
Insurance—
Startup—
Miscellaneous—
Total Capex$1.95B
Technology Centre Mongstad
CO₂ captured
5,658,960t/yr
Capture efficiency
70.0%
Utilization
85.0%
Parasitic load
182MW
CO₂ concentration
12.5%mol%
▸Direct Field Costs$1.65B
Coal & Sorbent Handling Equipment Cost—
Coal & Sorbent Prep & Feed Equipment Cost—
Feedwater & Misc. Balance of Plant Systems Equipment Cost—
Pulverized coal-fired boiler Equipment Cost—
Flue Gas Cleanup Equipment Cost—
CO2 Capture System Equipment Cost—
CO2 Compression and Purification Equipment—
HRSG, Ducting & Stack Equipment Cost—
Steam Turbine Generator Equipment Cost—
Cooling Water System Equipment Cost—
Ash/Spent Sorbent Handling System Equipment Cost—
Accessory Electric Plant Equipment Cost—
Instrumentation & Control Equipment Cost—
Improvements to Site Equipment Cost—
Materials Cost—
Labor—
▸Indirect Field Costs$187.0M
Engineering—
▸Contingency & Escalation$418.3M
Project Contingency—
Process Contingency—
▸Interest During Construction—
Report did not provide a further cost breakdown.
▸Owners Cost$507.6M
Financing Cost—
Pre-production Cost—
Inventory Capital—
Other's owners cost—
Total Capex$3.19B
Scottish Power / Longannet Power Station
CO₂ captured
2,000,000t/yr
Capture efficiency
90.0%
Utilization
—
Parasitic load
—MW
CO₂ concentration
—
▸Direct Field Costs$509.8M
Steam and Power Supply—
Carbon Capture Process—
Compression and Conditioning—
Balance of Plant and Utilities—
▸Indirect Field Costs—
Report did not provide a further cost breakdown.
▸Contingency & Escalation$98.5M
Contingency—
▸Interest During Construction—
Report did not provide a further cost breakdown.
▸Owners Cost$146.7M
Report did not provide a further cost breakdown.
Total Capex$755.0M