Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.

3 of 3 selectedClear selection46 reports
Comparing 3 reports โ€” tab selection applies to every column.

Gerald Gentleman Station

CoalFEEDยท ION Clean Energyยท 2023-03-01Project page โ†—Cost report โ†—
COโ‚‚ captured
4,316,020t/yr
Capture efficiency
89.8%
Utilization
85.0%
Parasitic load
โ€”MW
COโ‚‚ concentration
โ€”
โ–ธDirect Field Costs$2.17B
Switchyardโ€”
Auxiliary power and fansโ€”
Absorberโ€”
Common facilitiesโ€”
Carbon Capture Plantโ€”
โ–ธIndirect Field Costsโ€”
Report did not provide a further cost breakdown.
โ–ธContingency & Escalationโ€”
Report did not provide a further cost breakdown.
โ–ธInterest During Constructionโ€”
Report did not provide a further cost breakdown.
โ–ธOwners Costโ€”
Report did not provide a further cost breakdown.
Total Capex$2.17B

CRC / Elk Hills Power Plant

Natural GasFEEDยท Electric Power Research Institute (EPRI)ยท 2020-09-01Project page โ†—Cost report โ†—
COโ‚‚ captured
1,460,000t/yr
Capture efficiency
90.0%
Utilization
95.0%
Parasitic load
35MW
COโ‚‚ concentration
4.3%mol%
โ–ธDirect Field Costs$444.7M
Earthwork & Civilโ€”
Concreteโ€”
Structural Steelโ€”
Capture Plant Equipmentโ€”
Utilities Equipmentโ€”
CO2 Compression Equipmentโ€”
Pipingโ€”
Electrical and Control Systemsโ€”
Scaffolding, Painting, Insulationโ€”
Modularizationโ€”
Procurement, Taxes & Dutiesโ€”
Pre-commisioning and Startupโ€”
โ–ธIndirect Field Costs$206.3M
Indirect Field Costsโ€”
Home Officeโ€”
EPC Feesโ€”
โ–ธContingency & Escalation$96.0M
Escalationโ€”
Contingencyโ€”
โ–ธInterest During Constructionโ€”
Report did not provide a further cost breakdown.
โ–ธOwners Cost$47.8M
Report did not provide a further cost breakdown.
Total Capex$794.8M

(no name)

AmmoniaFEEDยท Nutrienยท 2024-11-01Project page โ†—
COโ‚‚ captured
747,155t/yr
Capture efficiency
95.0%
Utilization
โ€”
Parasitic load
โ€”MW
COโ‚‚ concentration
7.0%mol%
โ–ธDirect Field Costs$363.3M
Report did not provide a further cost breakdown.
โ–ธIndirect Field Costs$138.4M
Report did not provide a further cost breakdown.
โ–ธContingency & Escalation$209.5M
Report did not provide a further cost breakdown.
โ–ธInterest During Constructionโ€”
Report did not provide a further cost breakdown.
โ–ธOwners Costโ€”
Report did not provide a further cost breakdown.
Total Capex$711.2M