Carbon Capture Costs: FEED & pre-FEED Cost Reports
Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.
Comparing 3 reports โ tab selection applies to every column.
Gerald Gentleman Station
COโ captured
4,316,020t/yr
Capture efficiency
89.8%
Utilization
85.0%
Parasitic load
โMW
COโ concentration
โ
โธDirect Field Costs$2.17B
Switchyardโ
Auxiliary power and fansโ
Absorberโ
Common facilitiesโ
Carbon Capture Plantโ
โธIndirect Field Costsโ
Report did not provide a further cost breakdown.
โธContingency & Escalationโ
Report did not provide a further cost breakdown.
โธInterest During Constructionโ
Report did not provide a further cost breakdown.
โธOwners Costโ
Report did not provide a further cost breakdown.
Total Capex$2.17B
Technology Centre Mongstad
CoalLarge Pilotยท Membrane Technology and Research (MTR)ยท 2023-08-15Project page โCost report โ
COโ captured
5,658,960t/yr
Capture efficiency
70.0%
Utilization
85.0%
Parasitic load
182MW
COโ concentration
12.5%mol%
โธDirect Field Costs$1.65B
Coal & Sorbent Handling Equipment Costโ
Coal & Sorbent Prep & Feed Equipment Costโ
Feedwater & Misc. Balance of Plant Systems Equipment Costโ
Pulverized coal-fired boiler Equipment Costโ
Flue Gas Cleanup Equipment Costโ
CO2 Capture System Equipment Costโ
CO2 Compression and Purification Equipmentโ
HRSG, Ducting & Stack Equipment Costโ
Steam Turbine Generator Equipment Costโ
Cooling Water System Equipment Costโ
Ash/Spent Sorbent Handling System Equipment Costโ
Accessory Electric Plant Equipment Costโ
Instrumentation & Control Equipment Costโ
Improvements to Site Equipment Costโ
Materials Costโ
Laborโ
โธIndirect Field Costs$187.0M
Engineeringโ
โธContingency & Escalation$418.3M
Project Contingencyโ
Process Contingencyโ
โธInterest During Constructionโ
Report did not provide a further cost breakdown.
โธOwners Cost$507.6M
Financing Costโ
Pre-production Costโ
Inventory Capitalโ
Other's owners costโ
Total Capex$3.19B
Prairie State Generating
COโ captured
7,676,700t/yr
Capture efficiency
95.0%
Utilization
90.0%
Parasitic load
โMW
COโ concentration
11.4%vol%
โธDirect Field Costs$1.89B
Report did not provide a further cost breakdown.
โธIndirect Field Costsโ
Report did not provide a further cost breakdown.
โธContingency & Escalationโ
Report did not provide a further cost breakdown.
โธInterest During Constructionโ
Report did not provide a further cost breakdown.
โธOwners Cost$228.5M
Report did not provide a further cost breakdown.
Total Capex$2.12B