Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.
Comparing 3 reports β tab selection applies to every column.
Devon Energy / Jackfish-1 Oil Sands
COβ captured
365,000t/yr
Capture efficiency
90.0%
Utilization
85.0%
Parasitic load
βMW
COβ concentration
8.6%mol%
βΈDirect Field Costs$71.7M
Major Equipmentβ
Module Shop Fabricationβ
Site Installationβ
βΈIndirect Field Costs$6.7M
Engineeringβ
Project Managementβ
βΈContingency & Escalationβ
Report did not provide a further cost breakdown.
βΈInterest During Constructionβ
Report did not provide a further cost breakdown.
βΈOwners Costβ
Report did not provide a further cost breakdown.
Total Capex$78.4M
Southern Company / Plant Barry
COβ captured
2,400,000t/yr
Capture efficiency
β
Utilization
95.0%
Parasitic load
βMW
COβ concentration
99.0%vol%
βΈDirect Field Costs$91.8M
Dehydrationβ
CO2 Compression Equipmentβ
Equipment installation, instrumentation and controls, piping, electrical, engineering, construction expenses, contractorsβ fees, and process and project contingenciesβ
βΈIndirect Field Costsβ
Report did not provide a further cost breakdown.
βΈContingency & Escalationβ
Report did not provide a further cost breakdown.
βΈInterest During Constructionβ
Report did not provide a further cost breakdown.
βΈOwners Costβ
Report did not provide a further cost breakdown.
Total Capex$91.8M
Finnish Market Pulp Mill / Capture of CO2 in both Kraft & Multi-boilers
Pulp and Paperpre-FEEDΒ· VTT Technical Research Centre of FinlandΒ· 2016-12-01Project page βCost report β
COβ captured
1,749,600t/yr
Capture efficiency
90.0%
Utilization
95.9%
Parasitic load
28.5MW
COβ concentration
15.0%mol%
βΈDirect Field Costs$309.2M
Recovery Boiler: booster fan and ductworkβ
Lime Kiln: booster fan and ductworkβ
Multi-fuel boiler: booster fan and ductworkβ
Steam turbine island modificationsβ
Auxiliary boiler modificationsβ
Waste waster treatmentβ
Common flue gas stackβ
Direct Contact Coolerβ
Amine absorber sectionβ
Amine circulation systemβ
Stripper sectionβ
CO2 Compression and dehydrationβ
Auxiliariesβ
Other direct material costβ
Constructionβ
EPC and other costsβ
βΈIndirect Field Costsβ
Report did not provide a further cost breakdown.
βΈContingency & Escalation$30.9M
Contingencyβ
βΈInterest During Construction$50.2M
Report did not provide a further cost breakdown.
βΈOwners Cost$34.9M
Report did not provide a further cost breakdown.
Total Capex$425.2M