Carbon Capture Costs: FEED & pre-FEED Cost Reports

Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.

3 of 3 selectedClear selection46 reports
Comparing 3 reports โ€” tab selection applies to every column.

Scottish Power / Longannet Power Station

Natural GasFEEDยท ScottishPowerยท 2011-04-01Project page โ†—
COโ‚‚ captured
2,000,000t/yr
Capture efficiency
90.0%
Utilization
โ€”
Parasitic load
โ€”MW
COโ‚‚ concentration
โ€”
โ–ธDirect Field Costs$509.8M
Steam and Power Supplyโ€”
Carbon Capture Processโ€”
Compression and Conditioningโ€”
Balance of Plant and Utilitiesโ€”
โ–ธIndirect Field Costsโ€”
Report did not provide a further cost breakdown.
โ–ธContingency & Escalation$98.5M
Contingencyโ€”
โ–ธInterest During Constructionโ€”
Report did not provide a further cost breakdown.
โ–ธOwners Cost$146.7M
Report did not provide a further cost breakdown.
Total Capex$755.0M

Finnish Market Pulp Mill / Capture of CO2 in the Kraft Recovery Boiler only

Pulp and Paperpre-FEEDยท VTT Technical Research Centre of Finlandยท 2016-12-01Project page โ†—Cost report โ†—
COโ‚‚ captured
1,478,700t/yr
Capture efficiency
90.0%
Utilization
95.9%
Parasitic load
23.5MW
COโ‚‚ concentration
14.7%mol%
โ–ธDirect Field Costs$278.2M
Recovery Boiler Modifications: booster fan and ductworkโ€”
Lime Kiln Modifications: booster fan and ductworkโ€”
Multi-fuel boiler Modifications: booster fan and ductworkโ€”
Steam turbine island modificationsโ€”
Auxiliary boiler modificationsโ€”
Waste waster treatment modificationsโ€”
Common flue gas stackโ€”
Direct Contact Coolerโ€”
Amine absorber sectionโ€”
Amine circulation systemโ€”
Stripper sectionโ€”
CO2 Compression and dehydrationโ€”
Auxiliariesโ€”
Other direct material costโ€”
Constructionโ€”
EPC and other costsโ€”
โ–ธIndirect Field Costsโ€”
Report did not provide a further cost breakdown.
โ–ธContingency & Escalation$27.8M
Contingencyโ€”
โ–ธInterest During Construction$45.2M
Report did not provide a further cost breakdown.
โ–ธOwners Cost$31.3M
Report did not provide a further cost breakdown.
Total Capex$382.6M

Linde Hydrogen Plant

Hydrogenpre-FEEDยท Praxairยท 2022-11-03Project page โ†—Cost report โ†—
COโ‚‚ captured
1,360,000t/yr
Capture efficiency
95.0%
Utilization
โ€”
Parasitic load
โ€”MW
COโ‚‚ concentration
18.3%mol%
โ–ธDirect Field Costs$327.0M
Constructionโ€”
Carbon Capture Plantโ€”
โ–ธIndirect Field Costs$32.0M
Engineeringโ€”
โ–ธContingency & Escalation$81.0M
Project Contingencyโ€”
Process Contingencyโ€”
โ–ธInterest During Constructionโ€”
Report did not provide a further cost breakdown.
โ–ธOwners Cost$10.0M
Report did not provide a further cost breakdown.
Total Capex$481.5M