Tools

Carbon Capture Costs: FEED & pre-FEED Cost Reports

Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.

3 of 3 selectedClear selection46 reports
Comparing 3 reports โ€” tab selection applies to every column.

Peterhead Power Station (Aberdeenshire)

Natural GasFEEDยท Shellยท โ€”Project page โ†—Cost report โ†—
COโ‚‚ captured
1,000,000t/yr
Capture efficiency
90.0%
Utilization
โ€”
Parasitic load
โ€”MW
COโ‚‚ concentration
โ€”
โ–ธDirect Field Costs$331.4M
Electrical and Instrumentation / E&Iโ€”
Water Systemโ€”
CO2 Compression Equipmentโ€”
Constructionโ€”
Carbon Capture Plantโ€”
โ–ธIndirect Field Costs$89.7M
Indirect Field Costsโ€”
Engineeringโ€”
โ–ธContingency & Escalationโ€”
Report did not provide a further cost breakdown.
โ–ธInterest During Constructionโ€”
Report did not provide a further cost breakdown.
โ–ธOwners Cost$6.6M
Report did not provide a further cost breakdown.
Total Capex$427.7M

Southern Company / Plant Daniel

Natural GasFEEDยท Southern Companyยท 2022-11-30Project page โ†—Cost report โ†—
COโ‚‚ captured
1,769,520t/yr
Capture efficiency
90.0%
Utilization
โ€”
Parasitic load
79MW
COโ‚‚ concentration
โ€”
โ–ธDirect Field Costs$515.2M
Engineering-Procured Materialsโ€”
Construction โ€“ Including Labor, Materials, and Contracted Equipmentโ€”
โ–ธIndirect Field Costs$56.6M
Project Managementโ€”
Engineering โ€“ Including Construction and Startup Supportโ€”
โ–ธContingency & Escalation$126.3M
Contingencyโ€”
โ–ธInterest During Constructionโ€”
Report did not provide a further cost breakdown.
โ–ธOwners Cost$54.1M
Front End Planningโ€”
Startupโ€”
Other's owners costโ€”
Total Capex$752.2M

Southern Company / Plant Barry

Natural GasFEEDยท GE Gas Powerยท 2024-08-06Project page โ†—Cost report โ†—
COโ‚‚ captured
1,632,000t/yr
Capture efficiency
95.0%
Utilization
85.0%
Parasitic load
18.4MW
COโ‚‚ concentration
6.7%mol%
โ–ธDirect Field Costs$1.10B
Foundationsโ€”
Civil and Structuralโ€”
Piping and Ductingโ€”
NGCC Base Modifications Equipment Costโ€”
Exhaust Gas Recirculation System Equipment Costโ€”
Gas Turbine Modifications Equipment Costโ€”
CO2 Capture System (DCC, Absorber, Stripper and Reboiler) Equipment Costโ€”
CO2 Compression Equipmentโ€”
Cooling Water System (CCS Cooling Tower, Cooling Water Circulation Pumps and Heat Exchangers) Equipment Costโ€”
CCS Balance of Plant (OSBL) Electrical, Civil, Mechanical Interfaces to NGCCโ€”
Initial fill of CCS inventory (Solvent and Activated Carbon)'โ€”
Laborโ€”
โ–ธIndirect Field Costsโ€”
Report did not provide a further cost breakdown.
โ–ธContingency & Escalation$192.4M
Contingencyโ€”
โ–ธInterest During Constructionโ€”
Report did not provide a further cost breakdown.
โ–ธOwners Costโ€”
Report did not provide a further cost breakdown.
Total Capex$1.29B