Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.
Comparing 3 reports โ tab selection applies to every column.
Peterhead Power Station (Aberdeenshire)
COโ captured
1,000,000t/yr
Capture efficiency
90.0%
Utilization
โ
Parasitic load
โMW
COโ concentration
โ
โธDirect Field Costs$331.4M
Electrical and Instrumentation / E&Iโ
Water Systemโ
CO2 Compression Equipmentโ
Constructionโ
Carbon Capture Plantโ
โธIndirect Field Costs$89.7M
Indirect Field Costsโ
Engineeringโ
โธContingency & Escalationโ
Report did not provide a further cost breakdown.
โธInterest During Constructionโ
Report did not provide a further cost breakdown.
โธOwners Cost$6.6M
Report did not provide a further cost breakdown.
Total Capex$427.7M
Calpine / Deer Park Energy Center
COโ captured
500,000t/yr
Capture efficiency
95.0%
Utilization
85.0%
Parasitic load
30.4MW
COโ concentration
5.2%vol%
โธDirect Field Costs$415.7M
Feedwater & Miscellaneous Balance of Plant Systemsโ
Combustion Turbine & Accessoriesโ
HRSG, Ductwork, & Stackโ
Steam Turbine & Accessoriesโ
Cooling Water Systemโ
Accessory Electric Plantโ
Instrumentation & Controlโ
Improvements to Siteโ
CO2 Capture Systemโ
Material Costโ
Direct Laborโ
โธIndirect Field Costs$83.1M
Engineering, Construction Management, Home Office and Feeโ
โธContingency & Escalation$76.7M
Project Contingencyโ
โธInterest During Constructionโ
Report did not provide a further cost breakdown.
โธOwners Cost$19.9M
Pre-production Costโ
Inventory Capitalโ
Total Capex$595.5M
Southern Company / Plant Daniel
COโ captured
1,769,520t/yr
Capture efficiency
90.0%
Utilization
โ
Parasitic load
79MW
COโ concentration
โ
โธDirect Field Costs$515.2M
Engineering-Procured Materialsโ
Construction โ Including Labor, Materials, and Contracted Equipmentโ
โธIndirect Field Costs$56.6M
Project Managementโ
Engineering โ Including Construction and Startup Supportโ
โธContingency & Escalation$126.3M
Contingencyโ
โธInterest During Constructionโ
Report did not provide a further cost breakdown.
โธOwners Cost$54.1M
Front End Planningโ
Startupโ
Other's owners costโ
Total Capex$752.2M