Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.

3 of 3 selectedClear selection46 reports
Comparing 3 reports โ€” tab selection applies to every column.

Peterhead Power Station (Aberdeenshire)

Natural GasFEEDยท Shellยท โ€”Project page โ†—Cost report โ†—
COโ‚‚ captured
1,000,000t/yr
Capture efficiency
90.0%
Utilization
โ€”
Parasitic load
โ€”MW
COโ‚‚ concentration
โ€”
โ–ธDirect Field Costs$331.4M
Electrical and Instrumentation / E&Iโ€”
Water Systemโ€”
CO2 Compression Equipmentโ€”
Constructionโ€”
Carbon Capture Plantโ€”
โ–ธIndirect Field Costs$89.7M
Indirect Field Costsโ€”
Engineeringโ€”
โ–ธContingency & Escalationโ€”
Report did not provide a further cost breakdown.
โ–ธInterest During Constructionโ€”
Report did not provide a further cost breakdown.
โ–ธOwners Cost$6.6M
Report did not provide a further cost breakdown.
Total Capex$427.7M

Calpine / Deer Park Energy Center

Natural GasFEEDยท Calpineยท 2023-05-03Project page โ†—Cost report โ†—
COโ‚‚ captured
500,000t/yr
Capture efficiency
95.0%
Utilization
85.0%
Parasitic load
30.4MW
COโ‚‚ concentration
5.2%vol%
โ–ธDirect Field Costs$415.7M
Feedwater & Miscellaneous Balance of Plant Systemsโ€”
Combustion Turbine & Accessoriesโ€”
HRSG, Ductwork, & Stackโ€”
Steam Turbine & Accessoriesโ€”
Cooling Water Systemโ€”
Accessory Electric Plantโ€”
Instrumentation & Controlโ€”
Improvements to Siteโ€”
CO2 Capture Systemโ€”
Material Costโ€”
Direct Laborโ€”
โ–ธIndirect Field Costs$83.1M
Engineering, Construction Management, Home Office and Feeโ€”
โ–ธContingency & Escalation$76.7M
Project Contingencyโ€”
โ–ธInterest During Constructionโ€”
Report did not provide a further cost breakdown.
โ–ธOwners Cost$19.9M
Pre-production Costโ€”
Inventory Capitalโ€”
Total Capex$595.5M

Southern Company / Plant Daniel

Natural GasFEEDยท Southern Companyยท 2022-11-30Project page โ†—Cost report โ†—
COโ‚‚ captured
1,769,520t/yr
Capture efficiency
90.0%
Utilization
โ€”
Parasitic load
79MW
COโ‚‚ concentration
โ€”
โ–ธDirect Field Costs$515.2M
Engineering-Procured Materialsโ€”
Construction โ€“ Including Labor, Materials, and Contracted Equipmentโ€”
โ–ธIndirect Field Costs$56.6M
Project Managementโ€”
Engineering โ€“ Including Construction and Startup Supportโ€”
โ–ธContingency & Escalation$126.3M
Contingencyโ€”
โ–ธInterest During Constructionโ€”
Report did not provide a further cost breakdown.
โ–ธOwners Cost$54.1M
Front End Planningโ€”
Startupโ€”
Other's owners costโ€”
Total Capex$752.2M