Carbon Capture Costs: FEED & pre-FEED Cost Reports

Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.

3 of 3 selectedClear selection46 reports
Comparing 3 reports โ€” tab selection applies to every column.

Peterhead Power Station (Aberdeenshire)

Natural GasFEEDยท Shellยท โ€”Project page โ†—Cost report โ†—
COโ‚‚ captured
1,000,000t/yr
Capture efficiency
90.0%
Utilization
โ€”
Parasitic load
โ€”MW
COโ‚‚ concentration
โ€”
โ–ธDirect Field Costs$331.4M
Electrical and Instrumentation / E&Iโ€”
Water Systemโ€”
CO2 Compression Equipmentโ€”
Constructionโ€”
Carbon Capture Plantโ€”
โ–ธIndirect Field Costs$89.7M
Indirect Field Costsโ€”
Engineeringโ€”
โ–ธContingency & Escalationโ€”
Report did not provide a further cost breakdown.
โ–ธInterest During Constructionโ€”
Report did not provide a further cost breakdown.
โ–ธOwners Cost$6.6M
Report did not provide a further cost breakdown.
Total Capex$427.7M

CEMEX / Balcones Cement Plant

Cementpre-FEEDยท Membrane Technology and Research (MTR)ยท 2022-06-03Project page โ†—Cost report โ†—
COโ‚‚ captured
744,235t/yr
Capture efficiency
75.0%
Utilization
90.0%
Parasitic load
36MW
COโ‚‚ concentration
14.9%vol%
โ–ธDirect Field Costs$262.6M
Subcontractโ€”
Materialโ€”
Construction equipmentโ€”
Raw Material Relocationโ€”
Laborโ€”
Process equipmentโ€”
โ–ธIndirect Field Costs$123.7M
Project Indirectsโ€”
Construction Indirectโ€”
โ–ธContingency & Escalation$123.9M
Contingencyโ€”
Escalationโ€”
โ–ธInterest During Constructionโ€”
Report did not provide a further cost breakdown.
โ–ธOwners Costโ€”
Report did not provide a further cost breakdown.
Total Capex$510.2M

Devon Energy / Jackfish-1 Oil Sands

Natural GasFEEDยท Devon Energyยท 2011-11-01Project page โ†—Cost report โ†—
COโ‚‚ captured
365,000t/yr
Capture efficiency
90.0%
Utilization
85.0%
Parasitic load
โ€”MW
COโ‚‚ concentration
8.6%mol%
โ–ธDirect Field Costs$71.7M
Major Equipmentโ€”
Module Shop Fabricationโ€”
Site Installationโ€”
โ–ธIndirect Field Costs$6.7M
Engineeringโ€”
Project Managementโ€”
โ–ธContingency & Escalationโ€”
Report did not provide a further cost breakdown.
โ–ธInterest During Constructionโ€”
Report did not provide a further cost breakdown.
โ–ธOwners Costโ€”
Report did not provide a further cost breakdown.
Total Capex$78.4M