Tools

Carbon Capture Costs: FEED & pre-FEED Cost Reports

Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.

3 of 3 selectedClear selection46 reports
Comparing 3 reports โ€” tab selection applies to every column.

Red Trail Energy Richardton Ethanol

Ethanolยท Trimericยท 2019-11-20Project page โ†—Cost report โ†—
COโ‚‚ captured
214,255t/yr
Capture efficiency
โ€”
Utilization
95.9%
Parasitic load
โ€”MW
COโ‚‚ concentration
99.9%mol%
โ–ธDirect Field Costs$19.8M
CO2 Compression Equipmentโ€”
Installationโ€”
Storage Tankโ€”
Freight Costsโ€”
โ–ธIndirect Field Costsโ€”
Report did not provide a further cost breakdown.
โ–ธContingency & Escalationโ€”
Report did not provide a further cost breakdown.
โ–ธInterest During Constructionโ€”
Report did not provide a further cost breakdown.
โ–ธOwners Costโ€”
Report did not provide a further cost breakdown.
Total Capex$19.8M

Finnish Market Pulp Mill / Capture of CO2 in the Multi-fuel Boiler only

Pulp and Paperpre-FEEDยท VTT Technical Research Centre of Finlandยท 2016-12-01Project page โ†—Cost report โ†—
COโ‚‚ captured
270,658t/yr
Capture efficiency
90.0%
Utilization
95.9%
Parasitic load
4.4MW
COโ‚‚ concentration
16.8%mol%
โ–ธDirect Field Costs$82.9M
Recovery Boiler: booster fan and ductworkโ€”
Lime Kiln: booster fan and ductworkโ€”
Multi-fuel boiler: booster fan and ductworkโ€”
Steam turbine island modificationsโ€”
Auxiliary boiler modificationsโ€”
Waste waster treatmentโ€”
Common flue gas stackโ€”
Direct Contact Coolerโ€”
Amine absorber sectionโ€”
Amine circulation systemโ€”
Stripper sectionโ€”
CO2 Compression and dehydrationโ€”
Auxiliariesโ€”
Other direct material costโ€”
Constructionโ€”
EPC and other costsโ€”
โ–ธIndirect Field Costsโ€”
Report did not provide a further cost breakdown.
โ–ธContingency & Escalation$8.3M
Contingencyโ€”
โ–ธInterest During Construction$13.5M
Report did not provide a further cost breakdown.
โ–ธOwners Cost$9.2M
Report did not provide a further cost breakdown.
Total Capex$113.8M

Prairie State Generating

CoalFEEDยท University of Illinoisยท 2022-09-03Project page โ†—Cost report โ†—
COโ‚‚ captured
7,676,700t/yr
Capture efficiency
95.0%
Utilization
90.0%
Parasitic load
โ€”MW
COโ‚‚ concentration
11.4%vol%
โ–ธDirect Field Costs$1.89B
Report did not provide a further cost breakdown.
โ–ธIndirect Field Costsโ€”
Report did not provide a further cost breakdown.
โ–ธContingency & Escalationโ€”
Report did not provide a further cost breakdown.
โ–ธInterest During Constructionโ€”
Report did not provide a further cost breakdown.
โ–ธOwners Cost$228.5M
Report did not provide a further cost breakdown.
Total Capex$2.12B