Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.
Comparing 3 reports โ tab selection applies to every column.
Finnish Integrated Pulp and Board Mill / Capture of CO2 in the Lime Kiln only
Pulp and Paperpre-FEEDยท VTT Technical Research Centre of Finlandยท 2016-12-01Project page โCost report โ
COโ captured
197,008t/yr
Capture efficiency
90.0%
Utilization
95.9%
Parasitic load
2.8MW
COโ concentration
27.6%mol%
โธDirect Field Costs$52.8M
Recovery Boiler: booster fan and ductworkโ
Lime Kiln: booster fan and ductworkโ
Multi-fuel boiler: booster fan and ductworkโ
Steam turbine island modificationsโ
Auxiliary boiler modificationsโ
Waste waster treatmentโ
Common flue gas stackโ
Direct Contact Coolerโ
Amine absorber sectionโ
Amine circulation systemโ
Stripper sectionโ
CO2 Compression and dehydrationโ
Auxiliariesโ
Other direct material costโ
Constructionโ
EPC and other costsโ
โธIndirect Field Costsโ
Report did not provide a further cost breakdown.
โธContingency & Escalation$5.3M
Contingencyโ
โธInterest During Construction$8.6M
Report did not provide a further cost breakdown.
โธOwners Cost$5.9M
Report did not provide a further cost breakdown.
Total Capex$72.5M
CEMEX / Balcones Cement Plant
COโ captured
744,235t/yr
Capture efficiency
75.0%
Utilization
90.0%
Parasitic load
36MW
COโ concentration
14.9%vol%
โธDirect Field Costs$262.6M
Subcontractโ
Materialโ
Construction equipmentโ
Raw Material Relocationโ
Laborโ
Process equipmentโ
โธIndirect Field Costs$123.7M
Project Indirectsโ
Construction Indirectโ
โธContingency & Escalation$123.9M
Contingencyโ
Escalationโ
โธInterest During Constructionโ
Report did not provide a further cost breakdown.
โธOwners Costโ
Report did not provide a further cost breakdown.
Total Capex$510.2M
CLECO / Brame Energy Center Madison 3 Unit
CoalFEEDยท Cleco Powerยท 2025-03-25
COโ captured
4,280,000t/yr
Capture efficiency
95.0%
Utilization
80.0%
Parasitic load
โMW
COโ concentration
14.1%vol%
โธDirect Field Costs$667.2M
Report did not provide a further cost breakdown.
โธIndirect Field Costs$509.3M
Report did not provide a further cost breakdown.
โธContingency & Escalation$120.7M
Report did not provide a further cost breakdown.
โธInterest During Constructionโ
Report did not provide a further cost breakdown.
โธOwners Costโ
Report did not provide a further cost breakdown.
Total Capex$1.30B