Tools
Carbon Capture Costs: FEED & pre-FEED Cost Reports
Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.
Comparing 3 reports โ tab selection applies to every column.
Linde Hydrogen Plant
COโ captured
1,360,000t/yr
Capture efficiency
95.0%
Utilization
โ
Parasitic load
โMW
COโ concentration
18.3%mol%
โธDirect Field Costs$327.0M
Constructionโ
Carbon Capture Plantโ
โธIndirect Field Costs$32.0M
Engineeringโ
โธContingency & Escalation$81.0M
Project Contingencyโ
Process Contingencyโ
โธInterest During Constructionโ
Report did not provide a further cost breakdown.
โธOwners Cost$10.0M
Report did not provide a further cost breakdown.
Total Capex$481.5M
Scottish Power / Longannet Power Station
COโ captured
2,000,000t/yr
Capture efficiency
90.0%
Utilization
โ
Parasitic load
โMW
COโ concentration
โ
โธDirect Field Costs$509.8M
Steam and Power Supplyโ
Carbon Capture Processโ
Compression and Conditioningโ
Balance of Plant and Utilitiesโ
โธIndirect Field Costsโ
Report did not provide a further cost breakdown.
โธContingency & Escalation$98.5M
Contingencyโ
โธInterest During Constructionโ
Report did not provide a further cost breakdown.
โธOwners Cost$146.7M
Report did not provide a further cost breakdown.
Total Capex$755.0M
Finnish Integrated Pulp and Board Mill / Capture of CO2 in the Lime Kiln only
Pulp and Paperpre-FEEDยท VTT Technical Research Centre of Finlandยท 2016-12-01Project page โCost report โ
COโ captured
197,008t/yr
Capture efficiency
90.0%
Utilization
95.9%
Parasitic load
2.8MW
COโ concentration
27.6%mol%
โธDirect Field Costs$52.8M
Recovery Boiler: booster fan and ductworkโ
Lime Kiln: booster fan and ductworkโ
Multi-fuel boiler: booster fan and ductworkโ
Steam turbine island modificationsโ
Auxiliary boiler modificationsโ
Waste waster treatmentโ
Common flue gas stackโ
Direct Contact Coolerโ
Amine absorber sectionโ
Amine circulation systemโ
Stripper sectionโ
CO2 Compression and dehydrationโ
Auxiliariesโ
Other direct material costโ
Constructionโ
EPC and other costsโ
โธIndirect Field Costsโ
Report did not provide a further cost breakdown.
โธContingency & Escalation$5.3M
Contingencyโ
โธInterest During Construction$8.6M
Report did not provide a further cost breakdown.
โธOwners Cost$5.9M
Report did not provide a further cost breakdown.
Total Capex$72.5M