Carbon Capture Costs: FEED & pre-FEED Cost Reports

Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.

3 of 3 selectedClear selection46 reports
Comparing 3 reports โ€” tab selection applies to every column.

Linde Hydrogen Plant

Hydrogenpre-FEEDยท Praxairยท 2022-11-03Project page โ†—Cost report โ†—
COโ‚‚ captured
1,360,000t/yr
Capture efficiency
95.0%
Utilization
โ€”
Parasitic load
โ€”MW
COโ‚‚ concentration
18.3%mol%
โ–ธDirect Field Costs$327.0M
Constructionโ€”
Carbon Capture Plantโ€”
โ–ธIndirect Field Costs$32.0M
Engineeringโ€”
โ–ธContingency & Escalation$81.0M
Project Contingencyโ€”
Process Contingencyโ€”
โ–ธInterest During Constructionโ€”
Report did not provide a further cost breakdown.
โ–ธOwners Cost$10.0M
Report did not provide a further cost breakdown.
Total Capex$481.5M

CRC / Elk Hills Power Plant

Natural GasFEEDยท Electric Power Research Institute (EPRI)ยท 2020-09-01Project page โ†—Cost report โ†—
COโ‚‚ captured
1,460,000t/yr
Capture efficiency
90.0%
Utilization
95.0%
Parasitic load
35MW
COโ‚‚ concentration
4.3%mol%
โ–ธDirect Field Costs$444.7M
Earthwork & Civilโ€”
Concreteโ€”
Structural Steelโ€”
Capture Plant Equipmentโ€”
Utilities Equipmentโ€”
CO2 Compression Equipmentโ€”
Pipingโ€”
Electrical and Control Systemsโ€”
Scaffolding, Painting, Insulationโ€”
Modularizationโ€”
Procurement, Taxes & Dutiesโ€”
Pre-commisioning and Startupโ€”
โ–ธIndirect Field Costs$206.3M
Indirect Field Costsโ€”
Home Officeโ€”
EPC Feesโ€”
โ–ธContingency & Escalation$96.0M
Escalationโ€”
Contingencyโ€”
โ–ธInterest During Constructionโ€”
Report did not provide a further cost breakdown.
โ–ธOwners Cost$47.8M
Report did not provide a further cost breakdown.
Total Capex$794.8M

Devon Energy / Jackfish-1 Oil Sands

Natural GasFEEDยท Devon Energyยท 2011-11-01Project page โ†—Cost report โ†—
COโ‚‚ captured
365,000t/yr
Capture efficiency
90.0%
Utilization
85.0%
Parasitic load
โ€”MW
COโ‚‚ concentration
8.6%mol%
โ–ธDirect Field Costs$71.7M
Major Equipmentโ€”
Module Shop Fabricationโ€”
Site Installationโ€”
โ–ธIndirect Field Costs$6.7M
Engineeringโ€”
Project Managementโ€”
โ–ธContingency & Escalationโ€”
Report did not provide a further cost breakdown.
โ–ธInterest During Constructionโ€”
Report did not provide a further cost breakdown.
โ–ธOwners Costโ€”
Report did not provide a further cost breakdown.
Total Capex$78.4M