Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.

3 of 3 selectedClear selection46 reports
Comparing 3 reports โ€” tab selection applies to every column.

Linde Hydrogen Plant

Hydrogenpre-FEEDยท Praxairยท 2022-11-03Project page โ†—Cost report โ†—
COโ‚‚ captured
1,360,000t/yr
Capture efficiency
95.0%
Utilization
โ€”
Parasitic load
โ€”MW
COโ‚‚ concentration
18.3%mol%
โ–ธDirect Field Costs$327.0M
Constructionโ€”
Carbon Capture Plantโ€”
โ–ธIndirect Field Costs$32.0M
Engineeringโ€”
โ–ธContingency & Escalation$81.0M
Project Contingencyโ€”
Process Contingencyโ€”
โ–ธInterest During Constructionโ€”
Report did not provide a further cost breakdown.
โ–ธOwners Cost$10.0M
Report did not provide a further cost breakdown.
Total Capex$481.5M

Holcim / Ste. Genevieve Cement Plant

CementFEEDยท University of Illinoisยท 2024-08-29Project page โ†—Cost report โ†—
COโ‚‚ captured
3,056,339t/yr
Capture efficiency
95.0%
Utilization
85.0%
Parasitic load
60MW
COโ‚‚ concentration
20.3%mol%
โ–ธDirect Field Costs$900.4M
Instrumentaiton and Controlโ€”
Feedwater & Misc. Balance of Plant Equipment & Systemsโ€”
Accessory Electric Plantโ€”
Cooling Water Systemโ€”
Buldings & Structureโ€”
Improvements to Siteโ€”
CO2 Compression Equipmentโ€”
Flue Gas Cleanupโ€”
Ductwork and Stackโ€”
Laborโ€”
Carbon Capture Plantโ€”
โ–ธIndirect Field Costs$517.7M
Engineering, Construction Management, Home Office and Feeโ€”
โ–ธContingency & Escalation$250.5M
Contingencyโ€”
โ–ธInterest During Constructionโ€”
Report did not provide a further cost breakdown.
โ–ธOwners Cost$71.0M
Financing Costโ€”
Pre-production Costโ€”
Inventory Capitalโ€”
Total Capex$1.74B

Peterhead Power Station (Aberdeenshire)

Natural GasFEEDยท Shellยท โ€”Project page โ†—Cost report โ†—
COโ‚‚ captured
1,000,000t/yr
Capture efficiency
90.0%
Utilization
โ€”
Parasitic load
โ€”MW
COโ‚‚ concentration
โ€”
โ–ธDirect Field Costs$331.4M
Electrical and Instrumentation / E&Iโ€”
Water Systemโ€”
CO2 Compression Equipmentโ€”
Constructionโ€”
Carbon Capture Plantโ€”
โ–ธIndirect Field Costs$89.7M
Indirect Field Costsโ€”
Engineeringโ€”
โ–ธContingency & Escalationโ€”
Report did not provide a further cost breakdown.
โ–ธInterest During Constructionโ€”
Report did not provide a further cost breakdown.
โ–ธOwners Cost$6.6M
Report did not provide a further cost breakdown.
Total Capex$427.7M