Tools

Carbon Capture Costs: FEED & pre-FEED Cost Reports

Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.

3 of 3 selectedClear selection46 reports
Comparing 3 reports โ€” tab selection applies to every column.

Holcim / Portland Cement Plant

Cementpre-FEEDยท Electricoreยท 2023-01-31Project page โ†—Cost report โ†—
COโ‚‚ captured
1,733,750t/yr
Capture efficiency
90.0%
Utilization
โ€”
Parasitic load
76MW
COโ‚‚ concentration
10.1%vol%
โ–ธDirect Field Costs$292.8M
Supporting Facilities, Materials, Bulks/Commodities, and Direct & Indirect Labor Expenseโ€”
Purchased Equipment Costsโ€”
โ–ธIndirect Field Costs$91.1M
BEC + Engineering, Construction, Management, Home Office & Contractor Premiums, Allowances & Freight, and Process & Project Contingenciesโ€”
โ–ธContingency & Escalationโ€”
Report did not provide a further cost breakdown.
โ–ธInterest During Constructionโ€”
Report did not provide a further cost breakdown.
โ–ธOwners Cost$27.6M
Pre-Production Costs, Inventory Capital, Financing Costs and Other Owner Costsโ€”
Total Capex$411.5M

Finnish Market Pulp Mill / Capture of CO2 in both Kraft & Multi-boilers

Pulp and Paperpre-FEEDยท VTT Technical Research Centre of Finlandยท 2016-12-01Project page โ†—Cost report โ†—
COโ‚‚ captured
1,749,600t/yr
Capture efficiency
90.0%
Utilization
95.9%
Parasitic load
28.5MW
COโ‚‚ concentration
15.0%mol%
โ–ธDirect Field Costs$309.2M
Recovery Boiler: booster fan and ductworkโ€”
Lime Kiln: booster fan and ductworkโ€”
Multi-fuel boiler: booster fan and ductworkโ€”
Steam turbine island modificationsโ€”
Auxiliary boiler modificationsโ€”
Waste waster treatmentโ€”
Common flue gas stackโ€”
Direct Contact Coolerโ€”
Amine absorber sectionโ€”
Amine circulation systemโ€”
Stripper sectionโ€”
CO2 Compression and dehydrationโ€”
Auxiliariesโ€”
Other direct material costโ€”
Constructionโ€”
EPC and other costsโ€”
โ–ธIndirect Field Costsโ€”
Report did not provide a further cost breakdown.
โ–ธContingency & Escalation$30.9M
Contingencyโ€”
โ–ธInterest During Construction$50.2M
Report did not provide a further cost breakdown.
โ–ธOwners Cost$34.9M
Report did not provide a further cost breakdown.
Total Capex$425.2M

Red Trail Energy Richardton Ethanol

Ethanolยท Trimericยท 2019-11-20Project page โ†—Cost report โ†—
COโ‚‚ captured
214,255t/yr
Capture efficiency
โ€”
Utilization
95.9%
Parasitic load
โ€”MW
COโ‚‚ concentration
99.9%mol%
โ–ธDirect Field Costs$19.8M
CO2 Compression Equipmentโ€”
Installationโ€”
Storage Tankโ€”
Freight Costsโ€”
โ–ธIndirect Field Costsโ€”
Report did not provide a further cost breakdown.
โ–ธContingency & Escalationโ€”
Report did not provide a further cost breakdown.
โ–ธInterest During Constructionโ€”
Report did not provide a further cost breakdown.
โ–ธOwners Costโ€”
Report did not provide a further cost breakdown.
Total Capex$19.8M