Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.
Comparing 3 reports — tab selection applies to every column.
Cleveland Cliffs / Burns Harbor
CO₂ captured
2,800,000t/yr
Capture efficiency
95.0%
Utilization
—
Parasitic load
79MW
CO₂ concentration
21.9%vol%
▸Direct Field Costs$445.8M
Blast Furance Gas Processing Equipment Cost—
Carbon Capture Island Equipment Cost—
Steam and Power System Equipment Cost—
Material Cost—
Labor—
▸Indirect Field Costs$66.9M
EPC Fees—
▸Contingency & Escalation$67.5M
Contingency—
▸Interest During Construction$74.5M
Report did not provide a further cost breakdown.
▸Owners Cost$121.4M
Financing Cost—
Pre-production Cost—
Inventory Capital—
Other's owners cost—
Total Capex$776.1M
(no name)
CO₂ captured
1,778,645t/yr
Capture efficiency
99.0%
Utilization
—
Parasitic load
—MW
CO₂ concentration
7.0%mol%
▸Direct Field Costs$1.09B
Report did not provide a further cost breakdown.
▸Indirect Field Costs$337.8M
Report did not provide a further cost breakdown.
▸Contingency & Escalation$614.9M
Report did not provide a further cost breakdown.
▸Interest During Construction—
Report did not provide a further cost breakdown.
▸Owners Cost—
Report did not provide a further cost breakdown.
Total Capex$2.04B
Milton R. Young Power Plant
CO₂ captured
4,297,145t/yr
Capture efficiency
90.0%
Utilization
85.0%
Parasitic load
83.3MW
CO₂ concentration
8.6%vol%
▸Direct Field Costs$1.34B
Balance of Plant (Boiler, cooling tower, multipurpose building and substation)—
Earthwork Associated with Carbon Capture—
Water Supply and Treatment—
Wastewater—
Drainage—
Power Supply—
Controls & Internet—
Owner Facilities—
Impurity Removal and CO2 conditioning—
Enclosures & Buildings—
Carbon Capture Plant—
▸Indirect Field Costs$61.5M
Project Management—
Limited Notice to Proceed—
Services—
Miscellaneous Project Expenses (Insurance, taxes, bonds & permits)—
▸Contingency & Escalation$470.0M
Owner's Cost Contingency—
EPC Contingency—
Escalation—
Regional Adjustment for Labor—
▸Interest During Construction—
Report did not provide a further cost breakdown.
▸Owners Cost$71.2M
Spare Parts—
License fee—
Insurance—
Startup—
Miscellaneous—
Total Capex$1.95B