Carbon Capture Costs: FEED & pre-FEED Cost Reports
Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.
Comparing 3 reports β tab selection applies to every column.
Technology Centre Mongstad
CoalLarge PilotΒ· Membrane Technology and Research (MTR)Β· 2023-08-15Project page βCost report β
COβ captured
5,658,960t/yr
Capture efficiency
70.0%
Utilization
85.0%
Parasitic load
182MW
COβ concentration
12.5%mol%
βΈDirect Field Costs$1.65B
Coal & Sorbent Handling Equipment Costβ
Coal & Sorbent Prep & Feed Equipment Costβ
Feedwater & Misc. Balance of Plant Systems Equipment Costβ
Pulverized coal-fired boiler Equipment Costβ
Flue Gas Cleanup Equipment Costβ
CO2 Capture System Equipment Costβ
CO2 Compression and Purification Equipmentβ
HRSG, Ducting & Stack Equipment Costβ
Steam Turbine Generator Equipment Costβ
Cooling Water System Equipment Costβ
Ash/Spent Sorbent Handling System Equipment Costβ
Accessory Electric Plant Equipment Costβ
Instrumentation & Control Equipment Costβ
Improvements to Site Equipment Costβ
Materials Costβ
Laborβ
βΈIndirect Field Costs$187.0M
Engineeringβ
βΈContingency & Escalation$418.3M
Project Contingencyβ
Process Contingencyβ
βΈInterest During Constructionβ
Report did not provide a further cost breakdown.
βΈOwners Cost$507.6M
Financing Costβ
Pre-production Costβ
Inventory Capitalβ
Other's owners costβ
Total Capex$3.19B
(no name)
COβ captured
683,645t/yr
Capture efficiency
99.0%
Utilization
β
Parasitic load
βMW
COβ concentration
7.0%mol%
βΈDirect Field Costs$520.0M
Report did not provide a further cost breakdown.
βΈIndirect Field Costs$160.3M
Report did not provide a further cost breakdown.
βΈContingency & Escalation$293.2M
Report did not provide a further cost breakdown.
βΈInterest During Constructionβ
Report did not provide a further cost breakdown.
βΈOwners Costβ
Report did not provide a further cost breakdown.
Total Capex$973.6M
Southern Company / Plant Barry
COβ captured
4,200,000t/yr
Capture efficiency
β
Utilization
95.0%
Parasitic load
βMW
COβ concentration
99.0%vol%
βΈDirect Field Costs$158.7M
Dehydrationβ
CO2 Compression Equipmentβ
Equipment installation, instrumentation and controls, piping, electrical, engineering, construction expenses, contractorsβ fees, and process and project contingenciesβ
βΈIndirect Field Costsβ
Report did not provide a further cost breakdown.
βΈContingency & Escalationβ
Report did not provide a further cost breakdown.
βΈInterest During Constructionβ
Report did not provide a further cost breakdown.
βΈOwners Costβ
Report did not provide a further cost breakdown.
Total Capex$158.7M