Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.

3 of 3 selectedClear selection46 reports
Comparing 3 reports β€” tab selection applies to every column.

Holcim / Ste. Genevieve Cement Plant

CementFEEDΒ· University of IllinoisΒ· 2024-08-29Project page β†—Cost report β†—
COβ‚‚ captured
3,056,339t/yr
Capture efficiency
95.0%
Utilization
85.0%
Parasitic load
60MW
COβ‚‚ concentration
20.3%mol%
β–ΈDirect Field Costs$900.4M
Instrumentaiton and Controlβ€”
Feedwater & Misc. Balance of Plant Equipment & Systemsβ€”
Accessory Electric Plantβ€”
Cooling Water Systemβ€”
Buldings & Structureβ€”
Improvements to Siteβ€”
CO2 Compression Equipmentβ€”
Flue Gas Cleanupβ€”
Ductwork and Stackβ€”
Laborβ€”
Carbon Capture Plantβ€”
β–ΈIndirect Field Costs$517.7M
Engineering, Construction Management, Home Office and Feeβ€”
β–ΈContingency & Escalation$250.5M
Contingencyβ€”
β–ΈInterest During Constructionβ€”
Report did not provide a further cost breakdown.
β–ΈOwners Cost$71.0M
Financing Costβ€”
Pre-production Costβ€”
Inventory Capitalβ€”
Total Capex$1.74B

Red Trail Energy Richardton Ethanol

EthanolΒ· TrimericΒ· 2019-11-20Project page β†—Cost report β†—
COβ‚‚ captured
214,255t/yr
Capture efficiency
β€”
Utilization
95.9%
Parasitic load
β€”MW
COβ‚‚ concentration
99.9%mol%
β–ΈDirect Field Costs$19.8M
CO2 Compression Equipmentβ€”
Installationβ€”
Storage Tankβ€”
Freight Costsβ€”
β–ΈIndirect Field Costsβ€”
Report did not provide a further cost breakdown.
β–ΈContingency & Escalationβ€”
Report did not provide a further cost breakdown.
β–ΈInterest During Constructionβ€”
Report did not provide a further cost breakdown.
β–ΈOwners Costβ€”
Report did not provide a further cost breakdown.
Total Capex$19.8M

Southern Company / Plant Barry

AllΒ· TrimericΒ· 2020-02-01Project page β†—Cost report β†—
COβ‚‚ captured
2,400,000t/yr
Capture efficiency
β€”
Utilization
95.0%
Parasitic load
β€”MW
COβ‚‚ concentration
99.0%vol%
β–ΈDirect Field Costs$91.8M
Dehydrationβ€”
CO2 Compression Equipmentβ€”
Equipment installation, instrumentation and controls, piping, electrical, engineering, construction expenses, contractors’ fees, and process and project contingenciesβ€”
β–ΈIndirect Field Costsβ€”
Report did not provide a further cost breakdown.
β–ΈContingency & Escalationβ€”
Report did not provide a further cost breakdown.
β–ΈInterest During Constructionβ€”
Report did not provide a further cost breakdown.
β–ΈOwners Costβ€”
Report did not provide a further cost breakdown.
Total Capex$91.8M