Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.
Comparing 3 reports β tab selection applies to every column.
Holcim / Ste. Genevieve Cement Plant
COβ captured
3,056,339t/yr
Capture efficiency
95.0%
Utilization
85.0%
Parasitic load
60MW
COβ concentration
20.3%mol%
βΈDirect Field Costs$900.4M
Instrumentaiton and Controlβ
Feedwater & Misc. Balance of Plant Equipment & Systemsβ
Accessory Electric Plantβ
Cooling Water Systemβ
Buldings & Structureβ
Improvements to Siteβ
CO2 Compression Equipmentβ
Flue Gas Cleanupβ
Ductwork and Stackβ
Laborβ
Carbon Capture Plantβ
βΈIndirect Field Costs$517.7M
Engineering, Construction Management, Home Office and Feeβ
βΈContingency & Escalation$250.5M
Contingencyβ
βΈInterest During Constructionβ
Report did not provide a further cost breakdown.
βΈOwners Cost$71.0M
Financing Costβ
Pre-production Costβ
Inventory Capitalβ
Total Capex$1.74B
Red Trail Energy Richardton Ethanol
COβ captured
214,255t/yr
Capture efficiency
β
Utilization
95.9%
Parasitic load
βMW
COβ concentration
99.9%mol%
βΈDirect Field Costs$19.8M
CO2 Compression Equipmentβ
Installationβ
Storage Tankβ
Freight Costsβ
βΈIndirect Field Costsβ
Report did not provide a further cost breakdown.
βΈContingency & Escalationβ
Report did not provide a further cost breakdown.
βΈInterest During Constructionβ
Report did not provide a further cost breakdown.
βΈOwners Costβ
Report did not provide a further cost breakdown.
Total Capex$19.8M
Southern Company / Plant Barry
COβ captured
2,400,000t/yr
Capture efficiency
β
Utilization
95.0%
Parasitic load
βMW
COβ concentration
99.0%vol%
βΈDirect Field Costs$91.8M
Dehydrationβ
CO2 Compression Equipmentβ
Equipment installation, instrumentation and controls, piping, electrical, engineering, construction expenses, contractorsβ fees, and process and project contingenciesβ
βΈIndirect Field Costsβ
Report did not provide a further cost breakdown.
βΈContingency & Escalationβ
Report did not provide a further cost breakdown.
βΈInterest During Constructionβ
Report did not provide a further cost breakdown.
βΈOwners Costβ
Report did not provide a further cost breakdown.
Total Capex$91.8M