Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.

3 of 3 selectedClear selection46 reports
Comparing 3 reports โ€” tab selection applies to every column.

Rayburn Energy Station / Sherman Power Plant

Natural GasFEEDยท Bechtelยท 2022-03-01Project page โ†—Cost report โ†—
COโ‚‚ captured
645,000t/yr
Capture efficiency
85.0%
Utilization
57.0%
Parasitic load
67.3MW
COโ‚‚ concentration
6.0%mol%
โ–ธDirect Field Costs$385.9M
Distribution control system (DCS), communication, main power supply, all distribution system, auxiliary systemโ€”
CO2 absorptionโ€”
Civil structural workโ€”
General utility systemโ€”
CO2 Compression Equipmentโ€”
Flue Gas Conditioningโ€”
Solvent regenerationโ€”
Stack connection and modificationโ€”
โ–ธIndirect Field Costs$59.1M
Construction preliminariesโ€”
Engineeringโ€”
Mechanical completion, commissioning and testingโ€”
Trainingโ€”
โ–ธContingency & Escalationโ€”
Report did not provide a further cost breakdown.
โ–ธInterest During Construction$27.0M
Report did not provide a further cost breakdown.
โ–ธOwners Cost$5.0M
Report did not provide a further cost breakdown.
Total Capex$477.0M

(no name)

AmmoniaFEEDยท Nutrienยท 2024-11-01Project page โ†—
COโ‚‚ captured
683,645t/yr
Capture efficiency
99.0%
Utilization
โ€”
Parasitic load
โ€”MW
COโ‚‚ concentration
7.0%mol%
โ–ธDirect Field Costs$520.0M
Report did not provide a further cost breakdown.
โ–ธIndirect Field Costs$160.3M
Report did not provide a further cost breakdown.
โ–ธContingency & Escalation$293.2M
Report did not provide a further cost breakdown.
โ–ธInterest During Constructionโ€”
Report did not provide a further cost breakdown.
โ–ธOwners Costโ€”
Report did not provide a further cost breakdown.
Total Capex$973.6M

Calpine / Deer Park Energy Center

Natural GasFEEDยท Calpineยท 2023-05-03Project page โ†—Cost report โ†—
COโ‚‚ captured
500,000t/yr
Capture efficiency
95.0%
Utilization
85.0%
Parasitic load
30.4MW
COโ‚‚ concentration
5.2%vol%
โ–ธDirect Field Costs$415.7M
Feedwater & Miscellaneous Balance of Plant Systemsโ€”
Combustion Turbine & Accessoriesโ€”
HRSG, Ductwork, & Stackโ€”
Steam Turbine & Accessoriesโ€”
Cooling Water Systemโ€”
Accessory Electric Plantโ€”
Instrumentation & Controlโ€”
Improvements to Siteโ€”
CO2 Capture Systemโ€”
Material Costโ€”
Direct Laborโ€”
โ–ธIndirect Field Costs$83.1M
Engineering, Construction Management, Home Office and Feeโ€”
โ–ธContingency & Escalation$76.7M
Project Contingencyโ€”
โ–ธInterest During Constructionโ€”
Report did not provide a further cost breakdown.
โ–ธOwners Cost$19.9M
Pre-production Costโ€”
Inventory Capitalโ€”
Total Capex$595.5M